Pages Menu
Categories Menu

Kizomba Satellit pj

Project  Name: Kizomba Satellit pj
End Client: ExxonMobil
Start Date: Marc 04, 2009
End Date: October 10, 2009
Vendor(s) Name: Simas spa.
Vendor(s) Location: Prezzate di Mapello. Italy
Stages of processing and monitoring required on the following materials:
Hot Induction Bend. | PIM – PPM. | Raw Material. | Production Cutting & identification. | Transfer of Marks and stamp traceability. | Hot Bending. | Heat Treatment.
Test Sample. | Mechanical testing. | Intermediate dimensional check. | Surface conditioning | N.D.E.. MT – UT. | Visual and Dimensional check, according to DWG.
Final marking. | Protection / packing | Final certificates and Inspection Report. | Final documentation
Reporting Duties:
During the manufacture of this product, each phase has been checked and verified step by step.
According To Specification and Quality Control Plan and customer requirements:
Documentation Review of Document for client approval, of DWG, of fabrication and inspection progress | NDT operator qualification, Instrument Calibration. | Incoming Heat check of mill certificate. | After verifying all documents, including raw material, we proceed to cut.
After the forming of the piece, you run the final heat treatment. | Sampling test selection and mechanical testing. | Verification of all non-destructive testing to be performed; UT & MT, visual and dimensional, final marking.
Protection and packing check. | Review of final documentation