Pages Menu
Categories Menu

Kipper Tuna Gas Project

Project  Name: Kipper Tuna Gas Project
End Client: Esso Australia
Start Date: April 03, 2009
End Date: December 10, 2009
Job Title: Umbilical Inspector
Component: Inspector
Vendor(s) Name: Off Melesi & C. SRL.  (Vetco Gray & Mardale Pipe LTD)
Vendor(s) Location: Cortenova Lecco Italy
Project  Name: Kipper Tuna Gas pj
End Client: Esso Australia
Start Date: January 30, 2009
End Date: June 05, 2009
Job Title: Umbilical Inspector
Component: Inspector
Vendor(s) Name: Gam Raccordi spa (Vetco Gray & Mardale pipe LTD)
Vendor(s) Location: Piacenza Italy
On Site Duties: Stages of processing and monitoring required on the following materials:
Fittings |  PIM – PPM | Raw Material | Production Cutting & identification | Longitudinal Weld | Hot Forging | Final Treatment | Test Sample | Mechanical testing and ferrite cont | Blasting | Ferrite determination | XR Longitudinal weld | N.D.E. | Visual and Dimensional check, according to DWG | Final marking | Protection / packing | Final certificates and Inspection Report | Final documentation

Reporting Duties:
During the manufacture of this product, each phase has been checked and verified step by step.
According To Specification and Quality Control Plan and customer requirements:
Document for client approval.
Incoming Heat check of mill certificate.
after verifying all documents, including raw material, we proceed to cut, where required, proceed with the longitudinal weld.
after the forming of the piece, you run the final heat treatment.
Sampling test selection and mechanical testing.
Verification of all non-destructive testing to be performed; ferrite cont, xray, UT, visual and dimensional, final marking.
Protection and packing check
Review of final documentation