<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>ceser09 &#187; English</title>
	<atom:link href="http://www.ceser09.it/en/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.ceser09.it</link>
	<description>Consulting - Expediting - Inspection Services</description>
	<lastBuildDate>Tue, 21 Apr 2015 15:14:10 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.6.1</generator>
		<item>
		<title>Kizomba Satellities</title>
		<link>http://www.ceser09.it/en/kizomba-satellities/</link>
		<comments>http://www.ceser09.it/en/kizomba-satellities/#comments</comments>
		<pubDate>Thu, 14 Apr 2011 10:23:49 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2011]]></category>
		<category><![CDATA[Senza categoria]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=125</guid>
		<description><![CDATA[<p>Project  Name: Kizomba Satellities End Client: ExxonMob [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellities/">Kizomba Satellities</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kizomba Satellities<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobil<br />
<span style="color: #ff6600;">Start Date:</span> November 11, 2009<br />
January 11, 2010<br />
<span style="color: #ff6600;">End Date:</span> December 18, 2009<br />
July  21, 2010<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Forgiatura Mame’ Spa<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Brescia Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
RAW-FORGE STRAIGHT.<br />
Heat Treatment (Normalizing)-Heat Treatment (Austeniteze) -Heat Treatment (Quench and Temper  Hardness Test on piece After Heat Treatment &#8211; Mechanical and Metallography Test &#8211; Machining. Visual and Dimensional Check -Ultrasonic Test -Magnetic Particle Test &#8211; Final Hardness Test -Marking and Packing -Material Certification.<br />
<span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step.  According To Specification and Quality Control Plan and customer requirements:<br />
Documentation Review of Document for client approval, of DWG, of fabrication and inspection progress.<br />
NDT operator qualification, Instrument Calibration.<br />
Incoming Heat check of mill certificate.<br />
After verifying all documents, including raw material, we proceed to cut, where required,  after the forming of the piece, you run the final heat treatment.<br />
Sampling test selection and mechanical testing.<br />
Verification of all non-destructive testing to be performed; ferrite cont,  UT &amp; MT, visual and dimensional, final marking. Protection and packing check. Review of final documentation</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellities/">Kizomba Satellities</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kizomba-satellities/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>TAMAR</title>
		<link>http://www.ceser09.it/en/tamar/</link>
		<comments>http://www.ceser09.it/en/tamar/#comments</comments>
		<pubDate>Wed, 14 Apr 2010 10:25:35 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>
		<category><![CDATA[2010]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=131</guid>
		<description><![CDATA[<p>Project  Name: TAMAR Start Date: March 15, 2010 Job Tit [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/tamar/">TAMAR</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> TAMAR<br />
<span style="color: #ff6600;">Start Date:</span> March 15, 2010<br />
<span style="color: #ff6600;">Job Title:</span> Team Leader for Mill Production Inspections<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Tenaris Dalmine.<br />
<span style="color: #ff6600;">On Site Duties:</span> Hold Point &amp; Witness Inspections for Steps as Follow:<br />
PRE-PRODUCTION MEETING.<br />
<span style="color: #ff6600;">STEEL MAKING:</span> Electric Arc Furnace, Ladle Analysis.<br />
<span style="color: #ff6600;">ROUND BARS PRODUCTION:</span> Visual Check and Verify Stamping and Stenciling of Heat number on each bar.<br />
<span style="color: #ff6600;">ROLLING FTM MILL:</span> Check mill practice the operation of end cropping, dimensional and surface check.<br />
<span style="color: #ff6600;">HEAT TREATMENT:</span> Cycle time and temperatures verification. Straightness process control. Visual Straightness.<br />
<span style="color: #ff6600;">TRACEABILITY MARKING:</span> Verify traceability marking on each pipe, heat number, mill order, pipes number.<br />
<span style="color: #ff6600;">TEST SAMPLE SELECTION:</span> Samples selection of chemical &amp; mechanical test for FDPT and Production Test.<br />
<span style="color: #ff6600;">MECHANICAL TESTING:</span> First Day Production Test. Production Analysis. Tensile test at Room Temperature. Hardness Test. Charpy V-Notch Test.<br />
Charpy Transition Curve. CTOD Testing. Ageing Testing.<br />
<span style="color: #ff6600;">PRODUCTION TESTING:</span> Product Analysis. Tensile Test.<br />
<span style="color: #ff6600;">Impact Test:</span> Hardness Test. CTOD Testing.<br />
<span style="color: #ff6600;">ELECTROMAGNETIC INSPECT:</span> Longitudinal External Defects.<br />
<span style="color: #ff6600;">CUTTING and END PREPAR:</span> Length Check.<br />
<span style="color: #ff6600;">HYDROSTATIC TESTING:</span> Check pressure test time .<br />
<span style="color: #ff6600;">AUTOMATIC ULTRASONIC INSP. (Body &amp; Ends):</span> Longitudinal and Transverse check. Wall Thickness check. Lamination check.<br />
<span style="color: #ff6600;">MPI ON PIPE ENDS:</span> Laminations check<br />
<span style="color: #ff6600;">DIMENSIONAL INSPECTION:</span> Outside diameter body. Inside Diameter (Ends). Wall Thickness &amp; Eccentricity. Straightness. Dimensional tolerances on Ends.<br />
<span style="color: #ff6600;">RESIDUAL MAGNETISM:</span> Verification residual magnetism.<br />
<span style="color: #ff6600;">WEIGHT &amp; LECTH:</span> Weighing, length measurements.<br />
<span style="color: #ff6600;">PIPE MARKING:</span> Verification Pipes marking and pipes numbers.<br />
<span style="color: #ff6600;">VISUAL INSPECTION:</span> Visual inspection of Pipes. PIPE END PROTECTION. Pipe ends be protected by lift able plastic caps. LOAD &amp; DESPATCH.<br />
<span style="color: #ff6600;">DOCUMENTATION:</span> Final documentation, 3.1.Final Certificate &amp; Final Release Note.</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/tamar/">TAMAR</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/tamar/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kizomba Satellites pj</title>
		<link>http://www.ceser09.it/en/kizomba-satellites-pj/</link>
		<comments>http://www.ceser09.it/en/kizomba-satellites-pj/#comments</comments>
		<pubDate>Tue, 14 Apr 2009 10:26:34 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>
		<category><![CDATA[Senza categoria]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=129</guid>
		<description><![CDATA[<p>Project  Name: Kizomba Satellites pj End Client: ExxonM [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellites-pj/">Kizomba Satellites pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kizomba Satellites pj<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobile<br />
<span style="color: #ff6600;">Start Date:</span> October 13, 2009<br />
January 12, 2010<br />
<span style="color: #ff6600;">End Date:</span> December 23, 2009<br />
July 21, 2010<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Metalcam spa<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Brescia Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials: RAW-FORGE<br />
Heat Treatment (Normalizing)-Heat Treatment (Austeniteze) -Heat Treatment (Quench and Temper  Hardness Test on piece After Heat Treatment &#8211; Mechanical and Metallography Test &#8211; Machining. Visual and Dimensional Check -Ultrasonic Test -Magnetic Particle Test &#8211; Final Hardness Test -Marking and Packing -Material Certification<br />
<span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Documentation Review of Document for client approval, of DWG, of fabrication and inspection progress<br />
NDT operator qualification, Instrument Calibration.<br />
Incoming Heat check of mill certificate.<br />
after verifying all documents, including raw material, we proceed to cut, where required, after the forming of the piece, you run the final heat treatment.<br />
Sampling test selection and mechanical testing.<br />
Verification of all non-destructive testing to be performed; ferrite cont,  UT &amp; MT, visual and dimensional, final marking.<br />
Protection and packing check.<br />
Review of final documentation</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellites-pj/">Kizomba Satellites pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kizomba-satellites-pj/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kipper Tuna Gas Project</title>
		<link>http://www.ceser09.it/en/kipper-tuna-gas-project/</link>
		<comments>http://www.ceser09.it/en/kipper-tuna-gas-project/#comments</comments>
		<pubDate>Thu, 02 Apr 2009 12:41:40 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=85</guid>
		<description><![CDATA[<p>Project  Name: Kipper Tuna Gas Project End Client: Esso [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kipper-tuna-gas-project/">Kipper Tuna Gas Project</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kipper Tuna Gas Project<br />
<span style="color: #ff6600;">End Client:</span> Esso Australia<br />
<span style="color: #ff6600;">Start Date:</span> April 03, 2009<br />
<span style="color: #ff6600;">End Date:</span> December 10, 2009<br />
<span style="color: #ff6600;">Job Title:</span> Umbilical Inspector<br />
<span style="color: #ff6600;">Component:</span> Inspector<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Off Melesi &amp; C. SRL.  (Vetco Gray &amp; Mardale Pipe LTD)<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Cortenova Lecco Italy<br />
<span style="color: #ff6600;">Project  Name:</span> Kipper Tuna Gas pj<br />
<span style="color: #ff6600;">End Client:</span> Esso Australia<br />
<span style="color: #ff6600;">Start Date:</span> January 30, 2009<br />
<span style="color: #ff6600;">End Date:</span> June 05, 2009<br />
<span style="color: #ff6600;">Job Title:</span> Umbilical Inspector<br />
<span style="color: #ff6600;">Component:</span> Inspector<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Gam Raccordi spa (Vetco Gray &amp; Mardale pipe LTD)<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Piacenza Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
Fittings |  PIM – PPM | Raw Material | Production Cutting &amp; identification | Longitudinal Weld | Hot Forging | Final Treatment | Test Sample | Mechanical testing and ferrite cont | Blasting | Ferrite determination | XR Longitudinal weld | N.D.E. | Visual and Dimensional check, according to DWG | Final marking | Protection / packing | Final certificates and Inspection Report | Final documentation</p>
<p><span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step. According To Specification and Quality Control Plan and customer requirements:<br />
Document for client approval.<br />
Incoming Heat check of mill certificate.<br />
after verifying all documents, including raw material, we proceed to cut, where required, proceed with the longitudinal weld. after the forming of the piece, you run the final heat treatment.<br />
Sampling test selection and mechanical testing.<br />
Verification of all non-destructive testing to be performed; ferrite cont, xray, UT, visual and dimensional, final marking.<br />
Protection and packing check<br />
Review of final documentation</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kipper-tuna-gas-project/">Kipper Tuna Gas Project</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kipper-tuna-gas-project/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kizomba Satellit pj</title>
		<link>http://www.ceser09.it/en/kizomba-satellit-pj/</link>
		<comments>http://www.ceser09.it/en/kizomba-satellit-pj/#comments</comments>
		<pubDate>Wed, 11 Mar 2009 17:57:52 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=120</guid>
		<description><![CDATA[<p>Project  Name: Kizomba Satellit pj End Client: ExxonMob [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellit-pj/">Kizomba Satellit pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kizomba Satellit pj<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobil<br />
<span style="color: #ff6600;">Start Date:</span> Marc 04, 2009<br />
<span style="color: #ff6600;">End Date: </span>October 10, 2009<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Simas spa.<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Prezzate di Mapello. Italy<br />
Stages of processing and monitoring required on the following materials:<br />
Hot Induction Bend. | PIM – PPM. | Raw Material. | Production Cutting &amp; identification. | Transfer of Marks and stamp traceability. | Hot Bending. | Heat Treatment.<br />
Test Sample. | Mechanical testing. | Intermediate dimensional check. | Surface conditioning | N.D.E.. MT – UT. | Visual and Dimensional check, according to DWG.<br />
Final marking. | Protection / packing | Final certificates and Inspection Report. | Final documentation<br />
<span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Documentation Review of Document for client approval, of DWG, of fabrication and inspection progress | NDT operator qualification, Instrument Calibration. | Incoming Heat check of mill certificate. | After verifying all documents, including raw material, we proceed to cut.<br />
After the forming of the piece, you run the final heat treatment. | Sampling test selection and mechanical testing. | Verification of all non-destructive testing to be performed; UT &amp; MT, visual and dimensional, final marking.<br />
Protection and packing check. | Review of final documentation</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellit-pj/">Kizomba Satellit pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kizomba-satellit-pj/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kipper Tuna Gas pj</title>
		<link>http://www.ceser09.it/en/kipper-tuna-gas-pj/</link>
		<comments>http://www.ceser09.it/en/kipper-tuna-gas-pj/#comments</comments>
		<pubDate>Wed, 11 Feb 2009 17:47:22 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=115</guid>
		<description><![CDATA[<p>Project  Name: Kipper Tuna Gas pj End Client: Esso Aust [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kipper-tuna-gas-pj/">Kipper Tuna Gas pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kipper Tuna Gas pj<br />
<span style="color: #ff6600;">End Client:</span> Esso Australia<br />
<span style="color: #ff6600;">Start Date:</span> February 04, 2009<br />
<span style="color: #ff6600;">End Date:</span> February 23, 2009<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Inox Tech spa.<br />
(Vetco Gray &amp; Mardale pipe ltd)<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Rovigo Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
Welded Pipe stainless Steel | PIM – PPM | Raw Material | Production Cutting &amp; identification | Weld Pipe.<br />
Pipe calibration and Pig control passage | Sampling test selection | Mechanical testing | Performance of ferrite content | Metallographic ex | Corrosion test | P.I.M. \ Plain end machining | Radiographic ex | Dye penetrant ex bevel and weld metal | Pickling and passivation | Visual and Dimensional check | Pipe Marking | Packing and preservation and protection pipe | Final documentation.<br />
<span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Document for client approval | Incoming Heat check of mill certificate | Verification of welding procedures and qualifications of staff.<br />
Control of the forming tube, by calendaring | Longitudinally welded pipe,<br />
continue with the calibration of the tube and PIG control passage.<br />
<span style="color: #ff6600;">Sampling test selection and mechanical tests:</span><br />
Tensil test &#8211; impact test &#8211; hardness test- corrosion test &#8211; metallographic exam.<br />
Plain end machining check | Radiographic ex and P.I.M. | Dye Penetrant Test, bevel and in weld metal | Pickling and passivation | Visual and Dimensional check | Pipe Marking | Packing and preservation and protection pipe | Final documentation</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kipper-tuna-gas-pj/">Kipper Tuna Gas pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kipper-tuna-gas-pj/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kipper Tuna Gas pj</title>
		<link>http://www.ceser09.it/en/kipper-tuna-gas-pj-2/</link>
		<comments>http://www.ceser09.it/en/kipper-tuna-gas-pj-2/#comments</comments>
		<pubDate>Sun, 11 Jan 2009 18:05:45 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=123</guid>
		<description><![CDATA[<p>Project  Name: Kipper Tuna Gas pj End Client: Esso. Aus [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kipper-tuna-gas-pj-2/">Kipper Tuna Gas pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kipper Tuna Gas pj<br />
<span style="color: #ff6600;">End Client: </span>Esso. Australia<br />
<span style="color: #ff6600;">Start Date:</span> January 27, 2009<br />
<span style="color: #ff6600;">End Date:</span> July 19, 2010<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> PETROLVALVES. SPA. (Vetco Gray)<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Varese  Italy<br />
<span style="color: #ff6600;">Project  Name:</span> Kizomba Satellities<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobil<br />
<span style="color: #ff6600;">Start Date:</span> October 28, 2009<br />
January 19, 2010<br />
<span style="color: #ff6600;">End Date:</span> December 23, 2009<br />
March 04, 2010<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Forgital  Italia<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Verona. Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
RAW-FORGE STRAIGHT.<br />
Heat Treatment (Normalizing) &#8211; Heat Treatment (Austeniteze) &#8211; Heat Treatment (Quench and  Temper  Hardness Test on piece After Heat Treatment &#8211; Mechanical and Metallography Test &#8211; Machining. &#8211; Visual and Dimensional Check &#8211; Ultrasonic Test Magnetic Particle Test &#8211; Final Hardness Test &#8211; Marking and Packing  &#8211; Material Certification<br />
<span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Documentation Review of Document for client approval, of DWG, of fabrication and inspection progress NDT operator qualification, Instrument Calibration.<br />
Incoming Heat check of mill certificate. | After verifying all documents, including raw material, we proceed to cut, where required,  after the forming of the piece, you run the final heat treatment. | Sampling test selection and mechanical testing. | Verification of all non-destructive testing to be performed; ferrite cont,  UT &amp; MT, visual and dimensional, final marking.  | Protection and packing check. | Review of final documentation</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kipper-tuna-gas-pj-2/">Kipper Tuna Gas pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kipper-tuna-gas-pj-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kizomba Satellite pj</title>
		<link>http://www.ceser09.it/en/kizomba-satellite-pj/</link>
		<comments>http://www.ceser09.it/en/kizomba-satellite-pj/#comments</comments>
		<pubDate>Sun, 11 Jan 2009 17:52:23 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=118</guid>
		<description><![CDATA[<p>Project  Name: Kizomba Satellite pj End Client: ExxonMo [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellite-pj/">Kizomba Satellite pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kizomba Satellite pj<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobil<br />
<span style="color: #ff6600;">Start Date:</span> January 22, 2009<br />
<span style="color: #ff6600;">End Date:</span> October 12, 2009<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Galperti Engineering spa.<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Colico Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
Pup pieces-barred tee, pig gable | Anchor buckle arrestor | PIM – PPM | Raw Material | Production Cutting &amp; identification | Preheating for forging | Hot Forging | Final Treatment | Test Sample | Mechanical testing and ferrite cont. | Microstructure ex. | Pitting corrosion Test  | N.D.E. | Visual and Dimensional check, according to DWG | Final marking | Protection / packing | Final certificates and Inspection Report | Final documentation.<br />
<span style="color: #ff6600;">Reporting Duties:</span><br />
During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Document for client approval | Incoming Heat check of mill certificate. | After verifying all documents, including raw material, we proceed to cut. | After the forming of the piece, you run the final heat treatment. | Sampling test selection and mechanical testing. | Verification of all non-destructive testing to be performed; ferrite cont,  UT, visual and dimensional, final marking. | Protection and packing check. | Review of final documentation.</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellite-pj/">Kizomba Satellite pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kizomba-satellite-pj/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>EMDC Kizomba Satellite pj</title>
		<link>http://www.ceser09.it/en/emdc-kizomba-satellite-pj/</link>
		<comments>http://www.ceser09.it/en/emdc-kizomba-satellite-pj/#comments</comments>
		<pubDate>Fri, 02 Jan 2009 13:40:09 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2009]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=83</guid>
		<description><![CDATA[<p>Project  Name: EMDC Kizomba Satellite pj. End Client: E [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/emdc-kizomba-satellite-pj/">EMDC Kizomba Satellite pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> EMDC Kizomba Satellite pj.<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobil<br />
<span style="color: #ff6600;">Start Date:</span> January 08, 2009<br />
<span style="color: #ff6600;">End Date:</span> March 06, 2009<br />
<span style="color: #ff6600;">Job Title:</span> Umbilical Inspector<br />
<span style="color: #ff6600;">Component:</span> Inspector<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Forgiatura Rapida.<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Bologna, Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
Inner and Outer end Part, connector load rings.<br />
PIM &amp; PPM | Raw Material | Heat Treatment | Sampling test selection | Mechanical testig.<br />
Ultrasonic Examination, Visual and Dimensional check | Final Marking | Final documentation review.<br />
<span style="color: #ff6600;">Reporting Duties:</span> During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Document for client approval.<br />
Incoming Heat check of mill certificate.<br />
<span style="color: #ff6600;">Heat Treatment:</span>  calibration check of thermo couples  Check the positioning thermo couples Check the positioning of pieces and temperature monitoring and control.<br />
control chart to verify the permanence and the required temperature after heat treatment, you run the cutting of test pieces for mechanical tests  and chemical analysis. proceed with the examination Ultrasonic control, Visual and check sizing, final marking.<br />
Review of documentation.</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/emdc-kizomba-satellite-pj/">EMDC Kizomba Satellite pj</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/emdc-kizomba-satellite-pj/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Kizomba Satellite PJ</title>
		<link>http://www.ceser09.it/en/kizomba-satellite-pj-2/</link>
		<comments>http://www.ceser09.it/en/kizomba-satellite-pj-2/#comments</comments>
		<pubDate>Wed, 29 Oct 2008 18:05:04 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[2008]]></category>

		<guid isPermaLink="false">http://ceser09.it/?p=65</guid>
		<description><![CDATA[<p>Project  Name: Kizomba Satellite PJ End Client: ExxonMo [&#8230;]</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellite-pj-2/">Kizomba Satellite PJ</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><span style="color: #ff6600;">Project  Name:</span> Kizomba Satellite PJ<br />
<span style="color: #ff6600;">End Client:</span> ExxonMobile<br />
<span style="color: #ff6600;">Start Date:</span> October 23, 2008<br />
<span style="color: #ff6600;">End Date:</span> July 06, 2009<br />
<span style="color: #ff6600;">Job Title:</span> Umbilical Inspector<br />
<span style="color: #ff6600;">Component:</span> Inspector<br />
<span style="color: #ff6600;">Vendor(s) Name:</span> Cameron S.R.L.<br />
<span style="color: #ff6600;">Vendor(s) Location:</span> Colico. Lecco. Italy<br />
<span style="color: #ff6600;">On Site Duties:</span> Stages of processing and monitoring required on the following materials:<br />
Subsea Ball Valves &amp; Gate Valves | PIM &amp; PPM | Raw Material | UT after rough machining.<br />
Weld Inconel 625 Clading | Final machining of weld overlay | Dimensional examination | NDT | P.I.M.<br />
Ferrite check |Visual &amp; Dimensional check | FAT Test | Electric continuity check | Break-out torque | Drift Test | Hydrostatic Test | Gas Test | Final Inspection | Final Painting | Final protection | Final Documentation and Release for shipping.<br />
<span style="color: #ff6600;">Reporting Duties:</span> During the manufacture of this product, each phase has been checked and verified step by step.<br />
According To Specification and Quality Control Plan and customer requirements:<br />
Document for client approval | Incoming Heat check of mill certificate.<br />
Ultrasonic Exam after rough machining | Monitoring Weld inconel 625 | Check of final machining of weld overlay and dimensional check | Verification of Non Destructive Testing | P.I.M.  Ferrite check.<br />
FAT Test, electric continuity, break-out torque, drift test, gas test | Hydrostatic test | Final Inspection and final painting | Check of final documentation and data book.</p>
<p>The post <a rel="nofollow" href="http://www.ceser09.it/en/kizomba-satellite-pj-2/">Kizomba Satellite PJ</a> appeared first on <a rel="nofollow" href="http://www.ceser09.it/en">ceser09</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.ceser09.it/en/kizomba-satellite-pj-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
